CONTRACTOR
Consultation and site inspection
Type Price
Inside City limits Free
Outside city limits Rs. 2500
Budget Construction (Rs. 1650/sq.ft.)
Type Price
Mud bricks/solid block construction -
Manual Concrete -
Sunvik TMT steel -
3000 litres sump -
Vitrified tiles -
UPVC windows unit steel grill -
Berger paints/Asian paints -
Finolex wires, Anchor Switches -
Ess Ess and Varmora fittings, Ashirwad pipes -
Sintex tank (1500 litres) -
Average construction (Rs 2000/sq.ft)
Type Price
Mud bricks/Solid brick construction -
RMC concrete -
Tata/Jindal steel -
6000 litres sump -
Sintex overhead -
Teak/honne main door and Puja door -
Flush door for interior with oak frames -
Granite/ 3’X3’ vitrified tiles -
Oak wood windows/ UPVC windows -
Finolex wires/ Anchor switches -
Jaquar fittings/Supreme pipes and parryware -
Sintex overhead of 3000 litres -
Premium construction (Rs. 2500/sq. ft.)
Type Price
Wire cut bricks/ light weight bricks/ solid blocks -
RMC concrete -
Tata/Jindal steel -
8000 litres tank sump -
Burma teak/honne main door and interior doors -
Teak windows -
Italian marble/ 3’X3’ imported top quality vitrified tiles -
Havells wires/ switches -
Roca fittings, TOTO sanitary wares and supreme pipes -
Sintex overhead of 5000 litres -
Payment Schedule (For Ground floor)
Type Price
On appointment/signing of agreement and commencement of work 25%
Plinth level completion 10%
Lintel level completion 10%
Roof level completion 10%
Plastering work 10%
Plumbing and Electrical 10%
Plumbing and Electrical 15%
Plumbing and Electrical 10%
Payment Schedule (For Ground+1)
Type Price
Plinth level completion 10%
Roof 1 completion 10%
Roof 2 completion 10%
Lintel of both roofs 10%
Plastering work 10%
Plumbing and Electrical 10%
Plumbing and Electrical 10%
Plumbing and Electrical 10%
On appointment/signing of agreement and commencement of work 20%
Payment Schedule (For Ground+2)
Type Price
On appointment/signing of agreement and commencement of work 20%
Plinth level completion 10%
Roof 1 completion 10%
Roof 2 completion 10%
Roof 3 completion 10%
Plastering work 10%
Plastering work 10%
Plastering work 10%
Plastering work 10%